top of page

Hexa is a waterproof webbing material we imported from Europe. It is vibrant, super-flexible, and has a hexagon pattern embedded into the material giving it some extra grip, especially when wet. It is also really light-weight making it perfect for longer leads. If you are looking to do scentwork, field training or simply hit the trails with your pup this is the lead for you!

 

Our Tiki Teal Hexa Long Lead is  5/8" (16mm) wide with rounded and sealed edges for a clean look that prevents water absorbtion, and features gunmetal hardware including a ring for attaching items such as dog tags or doggy bags and a trigger snap for added strenght and security. Our Hexa leads are also assembled with chicago screws instead of rivets for a super-strong connection and are available in several lengths. 

 

These vibrant leads also match perfectly with our essential martingale and performance clip collars. 

Tiki Teal Hexa Long Lead

$36.99Price
Quantity
  • Need a differnet length lead or a smaller clip for the little pups?  No problem, we do custom! Contact us directly to order custom leads.

  • Buy any Essential Martingale or Performance Clip Collar and any Hexa Long Lead and save  $4.00. Discount will be added in your cart at checkout.

Contact Us
  • Black Facebook Icon
  • Black Instagram Icon
bottom of page